Grouting / Injection

INPIEQ Data Logging System measures and records different parameters during grouting / injection pile.

Grouting / Injection parameters:

  • Depth
  • Flow
  • Consumption l/mtr
  • Grouting / Injection pressure
  • Velocity
  • Inclination

Optional parameters:

  • Torque
  • Pull-Up
  • Rotary Speed
  • Hammer energy
  • etc.

All measured data of each made pile is transferred to the Report Analysis Sheet.

Report Analysis Sheet for grouting / injection piles

Don’t hesitate to request more info about the INPIEQ Data Logging System

< BACK

Data Login

Latest News

You know it better than anyone else: at construction sites progressively longer pipes are being...
Read more ...
As an addition to the INPIEQ DLS, we have developed a system that enable us to guide the rig as...
Read more ...
On behalf of a client from Belgium, we gave this old crane a comprehensive inspection. INPIEQ...
Read more ...